Kitchen Worktop Installation Costs in London (2026 Price Guide)
What it really costs to template, supply and fit kitchen worktops in London in 2026, including the extras quotes often leave out.
Kitchen worktop installation costs in London are one of the most searched local terms in this market because national “per metre” tables ignore parking, stairs, Congestion Charge and the premium on skilled stone fitters. This guide gives 2026 ranges you can take to a quote meeting.
Figures are typical supplied-and-fitted bands for a domestic kitchen, not a restaurant. Always get a written scope.
Contents
1 Installed price bands by material
2 How to compare quotes fairly
3 Frequently asked questions
Installed price bands by material
Use these as conversation starters for a 4–5 metre run without a huge island: laminate £400–£1,200; solid wood £1,200–£3,000; mid-range quartz £1,800–£3,500; granite £2,100–£3,800; marble £2,400–£6,000+; porcelain/Dekton £2,500–£6,000. Islands, waterfalls and splashbacks stack on top.
| Extra | Typical London add-on | Notes |
|---|---|---|
| Templating | £0–£250 (often included) | Confirm before you sign |
| Sink / hob cut-out | £50–£200 each if extra | Undermount costs more |
| Upstands | £30–£80 per metre | Cheaper than full splashback |
| Full-height splashback | £80–£180 per metre | Material dependent |
| Old worktop removal | £80–£250 | Plus making-good |
| Difficult access / hoist | £150–£600+ | Walk-ups and basements |
How to compare quotes fairly
Here are some of the most popular kitchen worktop materials:
Put every quote on one spreadsheet: material name and thickness, edge profile, number of joints, sink type, splashback, lead time, warranty, and whether weekend fitting is possible. The cheapest number is often the one that still has to add cut-outs later.
Request an itemised quote and take samples home before you commit to fabrication.
Frequently asked questions
Here are some of the most popular kitchen worktop materials:
How long does worktop installation take in London?
Fitting day is often half a day to a day once the tops are fabricated. The wait is usually 7–14 working days after templating for quartz, longer for special colours or porcelain.
Can I stay in the house while worktops are fitted?
Usually yes. You will be without a sink and hob until the tops are on and the plumber/electrician reconnects appliances. Plan a kettle and takeaway for one day.
Next step
Here are some of the most popular kitchen worktop materials:
Ready to compare surfaces for a London kitchen? Request a quote, order a free sample, or browse the full worktop range.